If you plan to bring a mobile home (CSA Z240) or manufactured home (CSA A277) into the Regional District of Fraser-Fort George, you must confirm that:
- the home is certified by CSA standards with the CSA label attached and the construction documentation must be available
- the home has a ground snow load of 4.3 kPa or greater
- the home has a valid BC registration
Many out-of-province units do not meet these requirements. If your unit does not meet snow load requirements, an engineer may need to review it and suggest possible fixes before a building permit is issued.
How to apply
You can submit Building Permit applications and documents by:
- email, hand delivery or mail
Required documents
The following documents are required before you can apply for a permit:
- Manufactured/Mobile Home Building Permit application form
- site plan
- two copies of building plans
- to a preferred scale of ¼” per foot, printed 11" x 17" or larger
- example
- Appointment of Agent form if you are using a contractor
- title search
- within the last three months
- Record of Sewage registered with Northern Health
- visit Engineers and Geoscientists BC to find a Registered Onsite Wastewater Practitioner
- Schedule B, if using steel piers
- engineer’s compliance report if the unit does not meet the snow load requirements or it has been altered
- CSA label and documentation
- BC registration
- $100 application processing fee