Secondary Suite Building Permits

Before applying, you should contact Development Services to check if your property zoning allows a secondary suite. You should also consider:

  • if the suite is detached with a shared roof, it must have a heated common area like a breezeway
  • secondary suites must have a separate entrance
  • assessing the septic system and upgrading it if it does not meet the design requirements

Required documents

The following documentation is required before you can apply for a permit: