Before applying, you should contact Development Services to check if your property zoning allows a secondary suite. You should also consider the following:
- if your suite is detached with a shared roof, you are required to have a heated common area like a breezeway
- your secondary suite must have a separate entrance
- you need to have your septic system assessed and upgraded if it does not meet the design requirements
How to apply
Building Permit applications are available at the Building Inspection Counter at the Regional District Office at 155 George Street, between the hours of 8:30-12:30 and 1:30 -5:00 or Online.
Please ensure that ALL required documents are ready for submission. Incomplete applications will not be accepted or processed. Application fees collected are non-refundable and cover the costs associated with reviewing and processing the application.
While contractors may be hired to complete construction work, it is the property owner’s responsibility to ensure that a building permit is obtained prior to construction commencing.
If you have any questions contact us at:
Required documents
The following documentation is required before you can apply for a permit:
- Building Permit application form
- Plumbing Permit application form
- site plan
- two copies of building plans
- to scale of 1/4" per foot preferred, printed 11" by 17" or larger
- plans must note the layout, fire and sound-rated walls and ceiling
- Appointment of Agent form if you are using a contractor
- title search
- within the last three months
- Record of Sewage registered with Northern Health
- visit Engineers and Geoscientists BC or Applied Science Technologists & Technicians of British Columbia to find a Registered Onsite Wastewater Practitioner
- BC Energy Pre-Construction Compliance Report (required when the suite is an addition to the residence) Energy Step Code
- truss layout and details if applicable
- $100 application processing fee