Secondary Suite Building Permits

Before applying, you should contact Development Services to check if your property zoning allows a secondary suite. You should also consider the following:

  • if your suite is detached with a shared roof, you are required to have a heated common area like a breezeway
  • your secondary suite must have a separate entrance
  • you need to have your septic system assessed and upgraded if it does not meet the design requirements

How to apply

Building Permit applications are available at the Building Inspection Counter at the Regional District Office at 155 George Street, between the hours of 8:30-12:30 and 1:30 -5:00 or Online. 

Please ensure that ALL required documents are ready for submission. Incomplete applications will not be accepted or processed. Application fees collected are non-refundable and cover the costs associated with reviewing and processing the application.

While contractors may be hired to complete construction work, it is the property owner’s responsibility to ensure that a building permit is obtained prior to construction commencing.

If you have any questions contact us at: 

building@rdffg.bc.ca

Required documents

The following documentation is required before you can apply for a permit: